Midnight Call Near Jennings Beach
A massive Nor'easter tore through Fairfield, leaving a construction site near Jennings Beach completely exposed. We got the call at 2:00 AM when the wind started howling through the gaps in the temporary perimeter. The salt air was biting, and the heavy gusts had already knocked over several sections of old, flimsy fencing. Without a secure boundary, the site faced immediate theft risks and massive liability issues if anyone wandered in from the beach.
Our crew loaded the truck before the sun even came up. We arrived on-site with our heavy-duty post drivers and fresh panels to reinforce the entire perimeter. We swapped out the damaged sections for our reinforced site fencing, ensuring every post sat deep and steady despite the saturated, sandy soil. The site manager breathed a sigh of relief once we secured the edge, knowing his equipment was safe from both the weather and intruders.
Sal's crew arrived in the middle of a storm and saved our entire project from chaos.
Construction Site Manager
